Building for the future: a summary of upcoming FIU construction projects
Brian Olmo | Editor-in-chief Recently, several major construction projects have been proposed to the Board of Trustees for consideration. Each building aims to fulfill a…
Brian Olmo | Editor-in-chief Recently, several major construction projects have been proposed to the Board of Trustees for consideration. Each building aims to fulfill a…
Andres Davila | News Director With the implementation of the Campus Master Plan in June, the Board of Trustees Ad Hoc Committee held a meeting…
Paloma Pimentel | Contributing Writer Each year, our world experiences climate-driven threats that intensify over time, such as record-breaking hot temperatures, devastating natural disasters, and…
Andres Davila | News Director Construction continues at FIU. In September 2021, FIU broke ground to construct a “121,000-square-foot, six-story building that will house makerspace…
Valentina Palm/Staff Writer Despite non-stop construction during the summer, the Biscayne Bay Campus food court will not open on time for the start of the…
Dalton Tevlin/Sports Director Figg Bridge Group, the construction company that was in charge of the FIU pedestrian bridge that collapsed and killed six people in…
By: Gerard Albert III/Assistant News Director This morning unexpected roadwork caused a major traffic delay for students heading to the Biscayne Bay campus on…
By: Joshua Ceballos/News Director Deuxieme Maison is undergoing construction, and the loose blue crystals are a thing of the past. DM, the building that…
By: Anna Radinsky/Assistant News Director Parts of the Gold Garage (Parking Garage 1) will be closed due to structural repairs at 7 a.m. on…
A section of 8th Street will be closed over the weekend to allow workers to position a 174-foot section of the footbridge which will link Sweetwater with the northern entrance of FIU.